View count: 6336

Samuel Chuen-Lung Chen

Professor, Department of Management Information Systems
National Chengchi University, Taiwan
Ph.D., Industrial and Systems Engineering, Auburn University, USA
Tel: +886-2-29393091 ext. 81218
Email: chen6200@gmail.com
This is an image Curriculum Vitae
 

Education

  • Ph.D. in Industrial and Systems Engineering, Auburn University, USA

Experience

  • Vice Dean, College of Commerce, National Chengchi University
  • Deputy Dean, College of Commerce, National Chengchi University
  • Director, International MBA Program, National Chengchi University
  • Chairman, Department of Management Information Systems, National Chengchi University
  • Professor, Department of Management Information Systems, National Chengchi University
  • Associate Professor, Department of Management Information Systems, National Chengchi University
  • Associate Professor, Department of Industrial Engineering, Mississippi State University, Mississippi, USA
  • Assistant Professor, Department of Industrial Engineering, Mississippi State University, Mississippi, USA

Research Interests

  • Applied Operations Research
  • Production and Operations Management
  • Scheduling Theory and Applications

Publications

A. Journal Papers


  • Chen CL, Tzeng, YR, Chen CL, 2015, “A new heuristic based on local best solution for permutation flow shop scheduling. Applied Soft Computing Vol. 29, pp. 75-81. (SCI, Impact Factor = 2.697)

  •  Hsieh, Ming-Hua, Liao, Wei-Cheng, and Chen, C-L, 2014, “A fast Monte Carlo algorithm for estimating value at risk and expected Shortfall,” Journal of Derivatives, Vol. 22, pp. 50-66. (SSCI, Impact Factor = 0.311)

  • Chen, Chun-Lung, Huang, S-Y, Tzeng, Y-R and Chen, C-L, 2014, “A revised discrete particle optimization algorithm for permutation flow-shop scheduling problem,” Soft Computing, 18(11), pp. 2271-2282. (SCI, Impact Factor = 1.304)

  • Yu, T-Y, Huang, H-C, Chen, C-L and Lin, Q-T, 2012, “Generating effective defined- contribution pension plan using simulation optimization approach,” Expert Systems with Applications, Vol. 39 (3), pp. 2684-2689. (SCI, Impact Factor = 2.203)

  • Kuo, Chan-Sheng, Hong, T-P and Chen C-L, 2012, “Developing a GP-based Framework for Knowledge Integration”, Journal of Convergence Information Technology, Vol.14, No.7, pp.79-88, (EI).

  • Tzeng, Y-Z, Chen, Chun-Lung and Chen, C-L, 2012, “A hybrid EDA with ACS for solving permutation flow shop scheduling,” International Journal of Advanced Manufacturing Technology, Vol. 60, pp. 1139-1147. (SCI, Impact Factor = 1.103).

  • Wu, Chung-Min, Chen, J-T and Chen, C-L, 2011, “The Consideration for Employing Web Services System,” Journal of the Chinese Institute of Industrial Engineers, Vol. 28(5), pp. 382-399. (EI/TSSCI)

  • Yu, T-Y, Tsai, C., Huang, J-C, and Chen, C-L, 2011, “Applying Simulation Optimization to Dynamic Financial Analysis for the Asset-Liability Management of a Property-Casualty Insurer,” Applied Financial Economics, Vol. 21 (7), pp. 505-518.

  • Huang, Hsiao-Tzu and Chen, C-L, 2009, “Emerging Organizational Structure for Knowledge-Oriented Teamwork Using Genetic Algorithm,” Expert Systems with Applications, Vol. 36(10), pp12137-12142. (SCI, Impact Factor = 2.203)

  • Chen, Chun-Lung and Chen, C-L, 2009, “A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines,” Vol. 36(11), pp. 3073-3081, Computers & Operations Research. (SCI, Impact Factor = 1.720)

  • Chen, Chun-Lung and Chen C-L, 2009, “Bottleneck-based heuristics to minimize total tardiness for the flexible flow line with unrelated parallel machines,” Vol. 56 (4), pp. 1393-1401, Computers and Industrial Engineering. (SCI, Impact Factor = 1.589).

  • Chen, Chun-Lung and Chen C-L, 2009, “Hybrid Metaheuristics for Unrelated Parallel-Machine Scheduling with Sequence-Dependent Setup Times” International Journal of Advanced Manufacturing Technology, Vol. 43, pp. 161-169, (SCI, Impact Factor = 1.103)

  • Kuo, Chan-Sheng, Hong, T-P and Chen C-L, 2008, “An Improved Knowledge-Acquisition Strategy Based on Genetic Programming,” Cybernetics and Systems, Vol. 39(7), pp. 672-685. (SCI, Impact Factor = 1.182)

  • Chen, Chun-Lung and Chen C-L, 2008, “Bottleneck-focused heuristics to minimize tardy jobs in a flexible flow line with unrelated parallel machines,” International Journal of Production Research, Vol. 46(22), pp. 6415-30 (SCI, Impact Factor = 1.115)

  • Kuo, Chan-Sheng, Hong, T-P and Chen C-L, 2007, “Applying Genetic Programming Technique in Classification Trees,” Soft Computing. Vol. 11(12), pp. 1165-1172. (SCI, Impact Factor = 1.880)

  • Chen, C-L, Kaber, D.B., and Dempsey, P.G., 2004, “Using Feed-forward Neural Networks and Forward Selection of Input Variables for an Ergonomics Data Classification Problem,” Human Factors & Ergonomics in Manufacturing, Vol. 14(1), pp.31-49. (SCI, Impact Factor = 0.612)

  • Chen, C-L, Lin, Rong-Ho, and Zhang, Jianping, 2003, “Genetic Algorithms for MD-Optimal Follow-up Designs,” Computers & Operations Research, Vol. 30(2), pp. 233-252. (SCI, Impact Factor = 1.720)

  • Chen, M-L, Wu, C-M, and Chen, C-L, 2002, “Integrated ART1 with Tabu Search for Cell Formation Problems, Journal of the Chinese Institute of Industrial Engineers, Vol. 19(3), pp. 62-74. (EI)

  • Chen, C-L, Kaber, D.B., and Dempsey, P.G., 2000, “A new approach to applying feedforward neural networks to the prediction of musculoskeletal disorder risk,” Applied Ergonomics, Vol. 31, pp. 269-282.  (SCI, Impact Factor = 1.428)

  • Gupta, J.N.D., Chen, C-L., Yap, L-Y, and Deshmukh, H., 2000, “Designing A Tabu Search Algorithm to Mizimize Total Flow Time in a Flow Shop,” Arabian Journal for Science and Engineering, Vol. 25, No. 1C, pp. 79-94. (SCI, Impact Factor = 0.243)

  • Gupta, J.N.D., Palanimuthu, N., and Chen, C-L., 1999, “Desinging Tabu Search Algorithm for the Two-Stage Flow Shop Problem with Secondary Criterion”, Production Planning and Control, Vol. 10, No. 3, pp. 251-265. (SCI, Impact Factor = 0.725)

  • Chen, C-L, Usher, J.M., and Palanimuthu, N., 1998, “A Tabu Search Based heuristic for a Flexible Flow Line with Minimum Flow Time Criterion,” International Journal of Industrial Engineering, Vol. 5, No. 2, pp. 157-168. (SCI)

  • Chen, C-L, Khan, M., and Wu, C-M., 1998, “Identifying Generators for 2k-p Experiments Using Taguchi Methods,” International Journal of Reliability, Quality and Safety Engineering, Vol. 5, No. 4, pp. 403-422.

  • Aljaber, N., Baek, W., and Chen, C-L, 1997, “Tabu Search Approach to the Cell Formation Problem,” Computers and Industrial Engineering, Vol.32, No. 1, pp. 169-185. (SCI, Impact Factor = 1.589)

  • Neppalli, V.R., Chen, C-L, and Gupta, J.N.D., 1996, “Genetic algorithms for the two-stage bicriteria flowshop problem,” European Journal of Operational Research, Vol. 95, pp. 356-373. (SCI, Impact Factor = 1.815)

  • Chen, C-L, Neppalli, V.R., and Aljaber, N., 1996, “Genetic Algorithms Applied to the Continuous Flow Shop Problem,” Computers and Industrial Engineering, Vol. 30, No. 4, pp. 919-929. (SCI, Impact Factor = 1.589)

  • Chen, C-L, Hart, S.M., and Tham, W.M., 1996, "A Simulated Annealing Heuristic for the One-Dimensional Cutting Stock Problem," European Journal of Operational Research, Vol 93, pp. 522-535. (SCI, Impact Factor = 1.815)

  • Chen, C-L., Vempati, V.S., and Aljaber, N., 1995, "An Application of Genetic Algorithms for Flow Shop Problems," European Journal of Operational Research, Vol. 80, pp. 389-396. (SCI, Impact Factor = 1.815)

  • Chen, C-L, Cotruvo, N.A., and Baek, W., 1995, "A Simulated Annealing Solution to the Cell Formation Problem," International Journal of Production Research, Vol. 33, No. 9, pp. 2601-2614. (SCI, Impact Factor = 1.115)

  • Chen, C-L, and Bulfin, R.L., 1994, "Scheduling a Single Machine to Minimize Two Criteria:  Maximum Tardiness and Number of Tardy Jobs," IIE Transactions, Vol. 26, No. 5, pp. 76-84. (SCI, Impact Factor = 0.856)

  • Hart, S.M. and Chen, C-L, 1994, "Simulated Annealing and the Mapping Problem: A Computational Study," Computers & Operations Research, Vol. 21, No. 4, pp. 455-461. (SCI, Impact Factor = 1.720)

  • Chen, C-L and Bulfin, R.L., 1993, "Complexity Results for Single Machine Scheduling Problems with Two Criteria," European Journal of Operational Research, Vol. 70, No. 1, pp. 115-125. (SCI, Impact Factor = 1.815)

  • Chen, C-L and Bullington, S. F., 1993, "Development of a Strategic Research Plan for an Academic Department Through the Use of Quality Function Deployment," Computers and Industrial Engineering, Vol. 25, No. 1-4, pp. 49-52. (SCI, Impact Factor = 1.589).

  • Venkateswara, V.S., Chen, C-L, and Bullington, S.F., 1993, "An Effective Heuristic for Flow Shop Problems with Total Flow Time as Criterion," Computers and Industrial Engineering, Vol. 25, No. 1-4, pp. 219-222. (SCI, Impact Factor = 1.589).

  • Chen, C-L. and Bulfin, R.L., 1990, "Scheduling Unit Processing Time Jobs on a Single Machine with Multiple Criteria," Computers and Operations Research, Vol. 17, No. 1, pp. 1-7. (SCI, Impact Factor = 1.720)